Methanol Tank Farm
.
Eurotech GmbH intends to design and construct methanol tank farm to distribute methanol in European countries and / or other potential customers. According to preliminary survey, two proper locations are nominated in two ports in Germany and Spain. Both locations which are sea port are located at UK Coast & Atlantic, North Sea which made access to north see. Quantity and volume of tankages will be specified in a detail feasibility study. 10 Hectares land is dedicated for the projects. A detailed feasibility study is ongoing to estimate the budgetary capital, operation and owner execution costs of project. Financing arrangement and schedule will be finalized at the end of the study. A qualified company to be nominated through a bid as construction contractor to execute the project based on turnkey scope of work to minimize engineering, procurement, construction and commissioning risks. Project time schedule is vary between 12 up to 18 months depends on the quantity and volume of tankages.
Eurotech GmbH will be investor and owner of the Plant and all operation and maintenance activities of the plant will be controlled by Eurotech GmbH upon startup.
Formaldehyde & Downstreams (Urea & Phenol & Melamine)
.
Eurotech GmbH intends to design and construct a 200 KTA Formaldehyde plant based on oxidation and dehydrogenation of methanol.
Formaldehyde is used as feedstock to produce 68 KTA Urea-Formaldehyde, 68 KTA Phenol-Formaldehyde and 68 KTA Melamine- Formaldehyde.
Urea, Phenol and Melamine supply from out sources.
Eurotech GmbH will be investor and owner of the Plant and all operation and maintenance activities of the plant will be controlled by Eurotech GmbH upon startup.